Project Narrative
- The work for this project was design-build of six residential luxury townhouses.
- The delivery method for this contract is lumpsum.
- The start and end dates for this contract were March 2014 and April 2016, the project was delivered on time.
- The self-performed trades for this contract were selective demolition, framing, floor finishes, drywall and painting.
- The date and point during design DC General was engaged was in October 2013, during schematic design phase.
- The initial substantial completion date for the contract was April 2016. The initial contract value was $10,000,000.00.
- The level of completion of design documents initial contract was based on is based on is 100% construction documents
- The actual substantial completion date for the contract was April 2016. The final contract value was $10,000,000.00.